Search results

Showing results 1-3 of 3

Order by:

Right first time

By Mel Orange 1 June 2020, Build 178

Licensed Building Practitioners (LBPs) should always aim to get their work done right the first time. It is an efficient way to get the job done on time, within budget and up to standard. It was also one of the reasons the licensing regime was introduced in the first place.

Read more