The Right Stuff

Practical how-to articles for builders and designers showing good industry practice and interpretation of the NZ Building Code and standards.

Showing results 1-6 of 6

Order by:

Concrete slabs and control joints

1 August 2005, Build 89

Concrete shrinks as it sets and will continue to shrink for at least 12 months after placing, depending on drying conditions. About 50% of the shrinkage occurs within the first 4 months.

Read more