By Trevor Pringle
–
1 October 2003, Build 78
One of the more difficult areas of detailing is excluding water where a pipe, meter box, or decorative or structural member penetrates the wall cladding material. Although the best option is to avoid penetrations here are some details that can help.
Read more
1 October 2003, Build 78
In the August/September 2002 edition of Build you would have received the BRANZ weathertightness poster. This column takes a detail from the poster and provides a ‘good practice’ solution to it.
Read more
By Trevor Pringle
–
1 October 2003, Build 78
Reverse-slope eaves are the ‘in’ feature of many current building designs. However, many of the details used may not effectively deal with the way water will impact on the completed construction.
Read more
By Trevor Pringle
–
1 October 2003, Build 78
Profiled metal claddings are a popular choice these days, but as with all claddings, care is still needed in the detailing, particularly the junctions.
Read more