EQ + Fire = PFP
BRANZ research investigating the impact of the Canterbury earthquakes on passive fire protection (PFP) has found awareness about the seismic performance of these important systems needs to be raised.
This website is best viewed on a newer browser than the one you are using. Learn about upgrading your browser (opens in a new window/tab)
Welcome to BRANZ Build. Skip to main content.
Showing results 1-2 of 2
Order by:
By Greg Baker – 1 February 2014, Build 140
BRANZ research investigating the impact of the Canterbury earthquakes on passive fire protection (PFP) has found awareness about the seismic performance of these important systems needs to be raised.
By Peter Collier, Greg Baker – 1 February 2013, Build 134, Feature article
An investigation into the performance of fire protection systems in the Christchurch earthquakes produced recommendations for change.