Edge detailing for membrane roofs
Don’t be misled into thinking that rubber roofing membranes can do without edge detailing. It’s required in E2/AS1, and omitting it can lead to stained walls.
This website is best viewed on a newer browser than the one you are using. Learn about upgrading your browser (opens in a new window/tab)
Welcome to BRANZ Build. Skip to main content.
Practical how-to articles for builders and designers showing good industry practice and interpretation of the NZ Building Code and standards.
Showing results 1-4 of 4
Order by:
By Trevor Pringle – 1 June 2012, Build 130
Don’t be misled into thinking that rubber roofing membranes can do without edge detailing. It’s required in E2/AS1, and omitting it can lead to stained walls.
By Alide Elkink – 1 June 2012, Build 130
A Build reader recently asked if H3.1 treatment for timber cladding is sufficient to protect against rot. It is, but only if primed before installation, painted and regularly maintained.
By Trevor Pringle – 1 June 2012, Build 130
E2/AS1 was updated last year – do you know what changed? This guide has 25 key changes to the design of a building structure and envelope.
By Alide Elkink – 1 June 2012, Build 130
Recent changes to E2/AS1 have slightly altered the construction requirements for window installation in drained cavity construction. What do designers, builders and window installers need to know?