Advanced façade systems
Emerging complex building façade designs can take up to a year to test, consent, fabricate and install. This makes it important for the project team to be on the same page from the start when it comes to design parameters.
This website is best viewed on a newer browser than the one you are using. Learn about upgrading your browser (opens in a new window/tab)
Welcome to BRANZ Build. Skip to main content.
Showing results 1-2 of 2
Do you want to try searching all of BRANZ?
Order by:
By Rob Teterin – 1 August 2020, Build 179
Emerging complex building façade designs can take up to a year to test, consent, fabricate and install. This makes it important for the project team to be on the same page from the start when it comes to design parameters.
By David Carradine – 1 February 2020, Build 176, Feature article
Higher-density housing is becoming more common and necessary as our population grows. BRANZ is helping designers with guidance on the specific engineering design methods and requirements for multi-storey light timber-framed buildings.