Edge detailing for membrane roofs
Don’t be misled into thinking that rubber roofing membranes can do without edge detailing. It’s required in E2/AS1, and omitting it can lead to stained walls.
This website is best viewed on a newer browser than the one you are using. Learn about upgrading your browser (opens in a new window/tab)
Welcome to BRANZ Build. Skip to main content.
Showing results 1-4 of 4
Do you want to try searching all of BRANZ?
Order by:
By Trevor Pringle – 1 June 2012, Build 130
Don’t be misled into thinking that rubber roofing membranes can do without edge detailing. It’s required in E2/AS1, and omitting it can lead to stained walls.
By Trevor Pringle – 1 June 2012, Build 130
E2/AS1 was updated last year – do you know what changed? This guide has 25 key changes to the design of a building structure and envelope.
By Alide Elkink – 1 August 2012, Build 131
The BRANZ Helpline regularly receives enquiries about when strapping must be used to tie the timber framing together. These tips should point you in the right direction.
By Nigel Isaacs – 1 October 2012, Build 132
Prone to earthquakes and with abundant native timber, New Zealand was quick to adopt timber as a building cladding. It could even replicate stone with design elements such as quoins.