Commercial buildings

Showing results 1-6 of 6

Order by:

Advanced façade systems

By Rob Teterin 1 August 2020, Build 179

Emerging complex building façade designs can take up to a year to test, consent, fabricate and install. This makes it important for the project team to be on the same page from the start when it comes to design parameters.

Read more

Aorangi House revitalisation

By Ben Masters 1 August 2019, Build 173, Feature article

An award-winning commercial building, once earmarked for demolition, is now a high-performing environment for tenants. It’s proof of how well an expertly upcycled building can perform, even surpassing new buildings.

Read more

Winner ready for the big one

By David Hindley 1 August 2019, Build 173, Feature article

The PwC Centre, the big winner in the 2019 New Zealand Commercial Project Awards, is ready for Wellington’s next big shake. The building includes continuous flight augured piles – a first in New Zealand.

Read more