Concrete slabs and control joints
As a result of the Canterbury earthquakes, there have been changes to the requirements for concrete floor slabs. Are you up to date?
This website is best viewed on a newer browser than the one you are using. Learn about upgrading your browser (opens in a new window/tab)
Welcome to BRANZ Build. Skip to main content.
Showing 1 result
Order by:
By Alide Elkink – 1 October 2013, Build 138
As a result of the Canterbury earthquakes, there have been changes to the requirements for concrete floor slabs. Are you up to date?